Building a deck is an exciting home improvement project, but one of the most common questions homeowners have is: “How long will it take?” The answer depends on several factors, including deck size, materials, weather, and whether you’re hiring professionals or taking the DIY route.
In this guide of deck Installation , we’ll break down:
✅ Average deck construction timelines (from planning to completion)
✅ Key factors that affect build time
✅ DIY vs. professional installation differences
✅ How to speed up the process
✅ When to hire deck builders texas
Deck Type | DIY Timeline | Professional Timeline |
---|---|---|
Small ground-level deck (10’x12′) | 2–4 weekends | 3–7 days |
Medium raised deck (16’x20′) | 4–6 weeks | 1–2 weeks |
Large multi-level deck (20’x30’+ features) | 8+ weeks | 2–4 weeks |
Composite deck (any size) | Add 10–20% more time | Similar to wood |
Planning & Design (1–4 weeks)
Choosing materials, finalizing size/style
Obtaining permits (if required)
Pro Tip: Work with a designer or use online deck planners to speed this up.
Site Preparation (1–3 days)
Clearing vegetation
Leveling ground
Marking layout
Foundation & Framing (2–7 days)
Pouring footings (cure time adds 1–3 days)
Installing support posts and joists
Decking Installation (1–5 days)
Laying boards (faster with hidden fasteners)
Cutting around obstacles
Railings & Stairs (1–4 days)
More complex designs take longer
Finishing Touches (1–2 days)
Sealing/staining (if using wood)
Installing lighting/accessories
A basic 12’x12′ deck can be built in 3–5 days by pros
A 20’x20′ deck with stairs and railings takes 7–14 days
Multi-level designs or curves add 25–50% more time
Pressure-treated wood: Fastest to install (standard sizing)
Composite/Trex: Slightly slower (requires precise spacing)
Exotic hardwoods (Ipe): Slowest (needs pre-drilling)
Rain halts concrete work (footings need 24+ dry hours)
Extreme heat can warp boards during installation
Winter freezes prevent concrete curing
Some municipalities approve permits in 48 hours
Others take 2–4 weeks (check local requirements early)
Pros work 5–6x faster (teams of 3–5 people)
DIYers typically take 4x longer (learning curve + limited tools)
Weekend 1: Plan/design, buy materials
Weekend 2: Prep site, pour footings
Weekend 3–4: Build frame, install decking
Weekend 5: Add railings, finish staining
Note: This assumes 10–15 hours/week. Mistakes or bad weather can double the time.
Incorrect measurements (forcing re-cuts)
Waiting for tool rentals
Learning proper joist spacing techniques
✔ Experienced crews (no trial-and-error)
✔ Commercial-grade tools (e.g., auto-feed screw guns)
✔ Parallel workflows (e.g., one team frames while another cuts decking)
Day 1: Demolish old deck (if needed), lay out posts
Day 2: Pour concrete footings
Day 3: Build frame once footings cure
Day 4–5: Install decking boards
Day 6: Add railings and stairs
Day 7: Final inspection/cleanup
Choose simple designs (rectangle > octagon)
Opt for pressure-treated wood (easiest to work with)
Pre-order materials to avoid delays
Schedule inspections in advance
Hire professional deck builders for large/complex projects
Most areas require permits for:
Decks > 30″ off the ground
Attached decks (connected to house)
Electrical work (lighting, outlets)
Typical Permit Timeline:
Application: 1–3 days to prepare
Review: 3–14 business days
Inspections: Adds 1–3 days total
DIY: 4 weekends to 3 months (depending on skill level)
Professional: 1–4 weeks (weather permitting)
For guaranteed timing and quality, consider hiring deck builders texas with proven track records.